The Recovery Plan Project Assignment

The Recovery Plan Project Assignment

Read the Recovery Plan Project case (linked in      Portfolio Project Option 1 in the Module 8 folder). Examine the project  management issues detailed in the case, including those concerning  procurement, contracts, and risk management.

Write an overview of one full page (not including the required title and references pages) of the case and the project management issues to be covered in more detail.

Include 2 current scholarly source Library that you  are likely to use in your final paper, exclusive of any course textbooks or lecture material.

  • Format your submission to conform to APA.

The Recovery Plan Project

Read the Recovery Plan project:

Van Wyk, Bowen, Akintoye. (2008). Project risk management practice: The case of a South African utility company (Links to an external site.). International Journal of Project Management, 26(2), 149-163.

Examine the project management issues detailed in the case, including those concerning procurement, contracts, and risk     management.

In no more than one page, give an overview of the case and the project management issues to be covered in more detail.

Discuss, in logical order, the following topics: (Note: You must determine the logical order of these topics; this is part      of your grade. See the grading rubric in this week’s folder.)

  • Risk identification
  • Risk assessment and prioritization
  • Risk response for prevention
  • Mitigation or contingent actions
  • The fundamental conceptual steps used to respond to   project risks
  • The strengths and weaknesses of the project risk management practices

In an appendix, identify the risks and categorize each one. (This categorization is left to you; however, you might include      external risks, such as regulatory and currency changes, or technical      risks, such as complexity or design.) You must discuss the appendix in the      body of your paper. In other words, do not simply say “see      appendix,” but rather explain what the appendix covers.

Discuss the prioritization of the risks identified their severity and the management response strategies

Pages 36, 37, 54, 55, 93, & 215 in Mastering Risk and Procurement

  • Noakes-Fry, K. (2016). Part II: Contracting for a resilient supply train. In K. Noakes-Fry (Ed.), Creating and Maintaining Resilient Supply Chains (64-101). Brookfield, CT: Rothstein Publishing.
  • Vereen, S. C., Sinacori, B., & Back, W. E. (2016). Critical risk considerations for cost estimating on international construction projects. International Journal of Construction Project Management, 8(2), 153-169.
  • Yamin, M., & Sim, A. K. S. (2016). Critical success factors for international development projects in Maldives: Project teams’ perspective. International Journal of Managing Projects in Business, 99(3), 481-504.
  • Das, A. (2013, October 29). Anti-dumping agreement: Overview. Centre for WTO Studies. UNESACP – ITC Technical Capacity Building Workshop on Afghanistan’s Accession to WTO. Retrieved from http://www.unescap.org/sites/default/files/Third%20Technical%20Workshop%20on%20Afghanistan%27s%20Accession%20to%20the%20World%20Trade%20Agreement%20-%20WTO%20Agreement%20on%20Anti-dumping%20by%20Prof.%20Abhijit%20Das.pdf
  • Dodge, W. S. (2015, December). International comity in American law. Columbia Law Review, 15(8), 2071-2141.
  • International Contract Law and Administration. (2013). In M. H. Ferrara (Ed.). Gale Business Insights Handbook of Global Business Law (pp. 191-200). Retrieved from http://link.galegroup.com/apps/doc/CX2759300026/GVRL?u=coloradosu&sid=GVRL&xid=894ebbd0.
  • International Trade Administration. (2016a). Cash in advance. Retrieved from https://www.export.gov/article?id=Cash-in-Advance
  • International Trade Administration. (2016b). Letters of credit. Retrieved from https://www.export.gov/article?id=Letters-of-Credit-and-Documentary-Collection
  • Joshi, A. S., & Neumann, G. (2012, May 8). A primer for Alien Tort Claims Act. Retrieved from http://apps.americanbar.org/litigation/committees/businesstorts/articles/spring2012-0512-primer-alien-tort-claims-act.html
  • Kerzner, H. R. (2013). Project management: A systems approach to planning, scheduling, and controlling (11th ed.). Wiley: New York.
  • Lenaghan, J. M. (2018). Tort liability of school districts, officers, and employees. Retrieved from https://eric.ed.gov/?id=ED088234
  • Struett, M. J., (2016). American governance. In S. Schechter, T. S. Vontz, T. A. Birkland, M. A. Graber, & J. J. Patrick (Eds.), Vol. 3. Farmington Hills, MI: Macmillan Reference USA.
  • U.S. Census Bureau. (2018). Guide to foreign trade statistics. Retrieved from https://www.census.gov/foreign-trade/guide/sec2.html
  • U.S. Department of Justice. (2018). Foreign Corrupt Practices Act. Retrieved from https://www.justice.gov/criminal-fraud/foreign-corrupt-practices-act